seinstoring

Signal failure: Arnhem-Doetinchem (16 March 2017)

  1. Disruption resolved Last update

    Between Arnhem Centraal and Zevenaar the train traffic is fully resumed.

  2. Delays decreasing

    Between Arnhem Centraal and Zevenaar the restrictions are resolved.
    Delays are decreasing.
    Service is normal around 10:00 AM hours.

  3. Update

    Between Arnhem Centraal and Zevenaar there are delays and fewer trains are running due to a signal failure.
    This will take until approximately 10:00 AM hours.

    Train measures

    • Stoptrein 30700 Arnhem C. - Doetinchem is cancelled between Arnhem Centraal and Zevenaar
    • Stoptrein 30900 Arnhem C. - Winterswijk is cancelled between Arnhem Centraal and Zevenaar
  4. Update

    Between Arnhem Centraal and Zevenaar there are fewer trains running due to a signal failure.
    The extra travel time may be up to 30 minutes.
    This will take until approximately 10:00 AM hours.

    Train measures

    • Stoptrein 30700 Arnhem C. - Doetinchem is cancelled between Arnhem Centraal and Zevenaar
    • Stoptrein 30900 Arnhem C. - Winterswijk is cancelled between Arnhem Centraal and Zevenaar
  5. Update

    Between Arnhem Centraal and Zevenaar there are fewer trains running due to a signal failure.
    The extra travel time may be up to 30 minutes.
    It is not known yet how long this will take.

    Train measures

    • Stoptrein 30700 Arnhem C. - Doetinchem is cancelled between Arnhem Centraal and Zevenaar
    • Stoptrein 30900 Arnhem C. - Winterswijk is cancelled between Arnhem Centraal and Zevenaar
  6. Update

    Between Arnhem Velperpoort and Zevenaar no local trains are running due to a signal failure.
    The extra travel time may be up to 60 minutes.
    It is not known yet how long this will take.

    Train measures

    • Stoptrein 30700 Arnhem C. - Doetinchem is cancelled between Arnhem Centraal and Zevenaar
    • Stoptrein 30900 Arnhem C. - Winterswijk is cancelled between Arnhem Centraal and Zevenaar
  7. Disruption

    Between Zevenaar and Doetinchem there is a service disruption due to a signal failure.
    Updates will follow as more information becomes available.

More about this disruption

Statistics

This disruption started at 7:10 AM on March 16, 2017 and took 2 hours, 44 minutes in total.

For statistics, this disruption is caused due to a signal failure.

Affected lines

The following lines are affected by this disruption:

Operators

This disruption affects trains operated by NS International, Arriva, Breng and Deutsche Bahn.

Got delayed due to this disruption? You may be reimbursed.

Refunds and passenger rights