defecte spoorbrug

Damaged railway bridge: Utrecht-Leiden (31 July 2017)

  1. Disruption resolved Last update

    Between Alphen a/d Rijn and Bodegraven the train traffic is fully resumed.

  2. Delays decreasing

    Between Alphen a/d Rijn and Bodegraven the restrictions are resolved.
    Delays are decreasing.
    Service is normal around 9:45 PM hours.

  3. Update

    Between Alphen a/d Rijn and Bodegraven no trains are running due to a damaged railway bridge.
    This will take until approximately 9:45 PM hours.

    Advice

    Passengers between Utrecht Centraal and Alphen a/d Rijn travel via Gouda. The extra travel time is up to 30 minutes.
    Passengers between Utrecht Centraal and Leiden Centraal travel via Schiphol Airport. The extra travel time is up to 30 minutes.

    Train measures

    • Intercity 8800 Leiden C. - Utrecht C. is cancelled between Alphen a/d Rijn and Bodegraven
  4. Update

    Between Alphen a/d Rijn and Bodegraven no trains are running due to a damaged railway bridge.
    It is not known yet how long this will take.

    Advice

    Passengers between Utrecht Centraal and Leiden Centraal travel via Schiphol Airport. The extra travel time is up to 30 minutes.
    Passengers between Utrecht Centraal and Alphen a/d Rijn travel via Gouda. The extra travel time is up to 30 minutes.

    Train measures

    • Intercity 8800 Leiden C. - Utrecht C. is cancelled between Alphen a/d Rijn and Bodegraven
  5. Disruption

    Between Alphen a/d Rijn and Bodegraven no trains are running due to a damaged railway bridge.
    It is not known yet how long this will take.

More about this disruption

Statistics

This disruption started at 8:58 PM on July 31, 2017 and took 46 minutes in total.

For statistics, this disruption is caused due to a damaged railway bridge.

Affected lines

The following lines are affected by this disruption:

Operators

This disruption affects trains operated by NS.

Got delayed due to this disruption? You may be reimbursed.

Refunds and passenger rights