seinstoring

Signal failure: Utrecht-Rhenen (25 March 2019)

  1. Disruption resolved Last update

    Between Driebergen-Zeist and Veenendaal Centrum no trains are running due to a signal failure.
    The extra travel time is more than 60 minutes.

More about this disruption

Statistics

This disruption started at 6:48 AM on March 25, 2019 and took 0 seconds in total.

For statistics, this disruption is caused due to a signal failure.

Affected lines

The following lines are affected by this disruption:

Operators

This disruption affects trains operated by NS.

Got delayed due to this disruption? You may be reimbursed.

Refunds and passenger rights