sein- en overwegstoring

Signal and level crossing failure: Venlo-Roermond (11 April 2019)

  1. Disruption resolved Last update

    Between Venlo and Roermond trains are crowded and travel times may be longer due to a signal and level crossing failure.

More about this disruption

Statistics

This disruption started at 11:34 AM on April 11, 2019 and took 0 seconds in total.

For statistics, this disruption is caused due to a signal and level crossing failure.

Affected lines

The following lines are affected by this disruption:

Operators

This disruption affects trains operated by Arriva.

Got delayed due to this disruption? You may be reimbursed.

Refunds and passenger rights