uitloop werkzaamheden

Over-running engineering works: Meppel-Leeuwarden (14 November 2019)

  1. Disruption resolved Last update

    Between Meppel and Leeuwarden the train traffic is fully resumed.

  2. Update

    Between Meppel and Leeuwarden there is a service disruption due to over-running engineering works.
    Updates will follow as more information becomes available.

  3. Disruption

    Between Leeuwarden and Meppel there is a service disruption due to over-running engineering works.
    Updates will follow as more information becomes available.

More about this disruption

Statistics

This disruption started at 5:12 AM on November 14, 2019 and took 16 minutes in total.

For statistics, this disruption is caused due to over-running engineering works.

Affected lines

The following lines are affected by this disruption:

Operators

This disruption affects trains operated by NS.

Got delayed due to this disruption? You may be reimbursed.

Refunds and passenger rights