Engineering works: Amsterdam - Brussel - Paris (HSL)
Situation
Between Amsterdam Centraal and Brussel-Zuid Midi are international trains diverted due to engineering works.
The extra travel time is about 45 minutes.
Period
Between Saturday, November 13, 2021 4:00 AM hours and Monday, November 15, 2021 2:00 AM hours.
Modified timetable
During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:
-
Thalys
9300
Amsterdam C. - Rotterdam C. - Brussel-Z. Midi - Paris-Nord
- has a changed schedule between Rotterdam Centraal and Brussel-Zuid Midi
- is diverted between Schiphol Airport and Rotterdam Centraal
More about these engineering works
Plan your trip
Plan your trip in advance and use the journey planner.
During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.
Affected lines
The following lines are affected by these engineering works:
Time periods
These engineering works are in effect between Saturday, November 13, 2021 4:00 AM and Monday, November 15, 2021 2:00 AM.