Engineering works: Utrecht - Rotterdam
Situation
Between Utrecht Centraal and Rotterdam Centraal buses are running due to engineering works.
The extra travel time may be up to 30 minutes.
Period
In the night from Sunday to Monday, November 1, 2021 between 12:00 AM and 2:15 AM hours.
Modified timetable
During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:
- Local buses are running between Woerden, Gouda Goverwelle, Gouda, Nieuwerkerk a/d IJssel, Capelle Schollevaar, Rotterdam Alexander, Rotterdam Noord and Rotterdam Centraal.
- Express buses are running between Utrecht Centraal, Gouda, Rotterdam Alexander and Rotterdam Centraal.
- Intercity 500 Rotterdam C. - Utrecht C. - Zwolle - Groningen is cancelled between Utrecht Centraal and Rotterdam Centraal (only in direction of Rotterdam Centraal)
- Sprinter 4000 Rotterdam C. - Woerden - Amsterdam C. - Uitgeest is cancelled between Woerden and Rotterdam Centraal (only in direction of Rotterdam Centraal)
- Sprinter 704000 Woerden - Utrecht C. runs as extra service between Woerden and Utrecht Centraal (only in direction of Utrecht Centraal)
More about these engineering works
Plan your trip
Plan your trip in advance and use the journey planner.
During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.
Affected lines
The following lines are affected by these engineering works:
Time periods
These engineering works are in effect between Monday, November 1, 2021 12:00 AM and Monday, November 1, 2021 2:15 AM.