Engineering works: Sittard - Heerlen
Situation
Between Sittard and Heerlen buses are running due to engineering works.
The extra travel time may be up to 30 minutes.
Period
Between Saturday, November 20, 2021 4:00 AM hours and Monday, November 29, 2021 2:00 AM hours.
Advice
Passengers between Heerlen and Schinnen and Spaubeek travel via Geleen Oost.
Modified timetable
During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:
- Express buses are running between Sittard and Heerlen.
- Minibuses are available between Geleen Oost, Spaubeek and Schinnen.
- Local buses are running between Sittard, Geleen Oost, Nuth, Hoensbroek and Heerlen.
- Intercity 3900 Enkhuizen - Utrecht C. - Eindhoven C. - Heerlen is cancelled between Sittard and Heerlen
- Stoptrein 32500 Sittard - Heerlen - Kerkrade C. is cancelled between Sittard and Heerlen
More about these engineering works
Plan your trip
Plan your trip in advance and use the journey planner.
During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.
Time periods
These engineering works are in effect between Saturday, November 20, 2021 4:00 AM and Monday, November 29, 2021 2:00 AM.