Unexpected engineering works: Delft
Situation
From and to Delft buses are running due to unexpected engineering works.
The extra travel time may be up to 30 minutes.
Period
In the night from Thursday to Friday, November 26, 2021 between 12:30 AM and 5:15 AM hours.
Advice
Passengers between Den Haag HS and Rotterdam Centraal travel via Gouda.
Modified timetable
During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:
- Express buses are running between Den Haag HS, Delft and Rotterdam Centraal.
- Intercity 1400 Rotterdam C. - Leiden C. - Amsterdam C. - Utrecht C. is being diverted and will make an extra call at Gouda between Den Haag HS and Rotterdam Centraal
More about these engineering works
Plan your trip
Plan your trip in advance and use the journey planner.
During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.
Affected lines
The following lines are affected by these engineering works:
Time periods
These engineering works are in effect between Friday, November 26, 2021 12:30 AM and Friday, November 26, 2021 5:15 AM.