Engineering works: Amsterdam - Köln - Zürich HB
Situation
Between Amsterdam Centraal and Zürich HB the international timetable has been changed due to engineering works.
There is no additional travel time..
Period
Between Monday, February 7, 2022 6:45 PM hours and Friday, February 11, 2022 9:00 PM hours.
Modified timetable
During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:
- Nightjet 402 to 403 Amsterdam C. - Utrecht C. - Frankfurt Hbf - Zürich HB is cancelled between Utrecht Centraal and Amsterdam Centraal (only in direction of Amsterdam Centraal)
More about these engineering works
Plan your trip
Plan your trip in advance and use the journey planner.
During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.
Affected lines
The following lines are affected by these engineering works:
Time periods
These engineering works are in effect between Monday, February 7, 2022 6:45 PM and Friday, February 11, 2022 9:00 PM.