Engineering works: Amsterdam - Rotterdam - Brussel (HSL)
Situation
Between Antwerpen-Centraal and Brussel-Noord the international timetable has been changed due to engineering works.
There is no additional travel time..
Period
Between Saturday, February 5, 2022 4:00 AM hours and Monday, February 7, 2022 2:00 AM hours.
Modified timetable
During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:
-
Intercity direct
9200
Amsterdam C. - Rotterdam C. - Antwerpen-C. - Brussel-Z. Midi
- does not call at Mechelen and Brussels Airport-Zaventem
- will make an extra stop at Mechelen-Nekkerspoel
More about these engineering works
Plan your trip
Plan your trip in advance and use the journey planner.
During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.
Affected lines
The following lines are affected by these engineering works:
Time periods
These engineering works are in effect between Saturday, February 5, 2022 4:00 AM and Monday, February 7, 2022 2:00 AM.