Engineering works elsewhere: Amsterdam Lelylaan
Situation
From and to Amsterdam Lelylaan the timetable has been changed due to engineering works elsewhere.
Period
Between Saturday, April 2, 2022 4:00 AM hours and Monday, April 4, 2022 2:00 AM hours.
Modified timetable
During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:
- Sprinter 5800 Hoofddorp - Amsterdam C. is cancelled between Amsterdam Centraal and Hoofddorp
-
Intercity
28500
Amsterdam C. - Hoofddorp
- does not call at Amsterdam Lelylaan
- runs as extra service between Amsterdam Centraal and Hoofddorp
More about these engineering works
Plan your trip
Plan your trip in advance and use the journey planner.
During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.
Affected lines
The following lines are affected by these engineering works:
Time periods
These engineering works are in effect between Saturday, April 2, 2022 4:00 AM and Monday, April 4, 2022 2:00 AM.