engineering works

Engineering works: Amersfoort - Deventer

Situation

Between Amersfoort Centraal and Deventer the timetable has been changed due to engineering works.
There is no additional travel time..

Period

On Friday, May 27, 2022 between 7:00 AM and 6:00 PM hours.

Last update:

Modified timetable

During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:

More about these engineering works

Plan your trip

Plan your trip in advance and use the journey planner.

During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.

Affected lines

The following lines are affected by these engineering works:

Time periods

These engineering works are in effect between Friday, May 27, 2022 7:00 AM and Friday, May 27, 2022 6:00 PM.