Engineering works: Amsterdam - Utrecht
Situation
Between Abcoude and Amsterdam Holendrecht the timetable has been changed due to engineering works.
There is no additional travel time..
Period
In the night from Thursday to Friday, June 24, 2022 between 12:15 AM and 12:45 AM hours.
Advice
Passengers from Breukelen towards Abcoude and Amsterdam Holendrecht travel via Amsterdam Bijlmer ArenA. The extra travel time is up to 30 minutes.
Modified timetable
During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:
- Sprinter 7300 Breukelen - Utrecht C. - Rhenen does not call at Abcoude and Amsterdam Holendrecht (only in direction of Amsterdam Centraal)
More about these engineering works
Plan your trip
Plan your trip in advance and use the journey planner.
During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.
Affected lines
The following lines are affected by these engineering works:
Time periods
These engineering works are in effect between Friday, June 24, 2022 12:15 AM and Friday, June 24, 2022 12:45 AM.