Engineering works: Utrecht - Hilversum - Weesp
Situation
Between Hilversum and Weesp the timetable has been changed due to engineering works.
There is no additional travel time..
Period
Between Saturday, June 25, 2022 4:00 AM hours and Monday, June 27, 2022 2:00 AM hours.
Modified timetable
During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:
- Sprinter 4900 Utrecht C. - Hilversum - Almere C. will make an extra stop at Hollandsche Rading
- Sprinter 5700 Utrecht C. - Hilversum - Hoofddorp is cancelled between Utrecht Centraal and Hoofddorp
- Sprinter 4900 Utrecht C. - Hilversum - Almere C. runs the entire day between Utrecht Centraal and Almere Centrum
More about these engineering works
Plan your trip
Plan your trip in advance and use the journey planner.
During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.
Affected lines
The following lines are affected by these engineering works:
Time periods
These engineering works are in effect between Saturday, June 25, 2022 4:00 AM and Monday, June 27, 2022 2:00 AM.