engineering works

Engineering works: Amsterdam - Passau - Wien

Situation

Between Amsterdam Centraal and Wien Hbf the international timetable has been changed due to engineering works.
There is no additional travel time..

Period

Between Friday, August 26, 2022 7:25 PM hours and Friday, September 9, 2022 8:35 PM hours.

Last update:

Modified timetable

During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:

More about these engineering works

Plan your trip

Plan your trip in advance and use the journey planner.

During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.

Time periods

These engineering works are in effect between Friday, August 26, 2022 7:25 PM and Friday, September 9, 2022 8:35 PM.