engineering works

Engineering works: Haarlem - Leiden; Haarlem - Zandvoort

Situation

Between Haarlem and Leiden Centraal buses are running due to engineering works.
Between Haarlem and Zandvoort aan Zee buses are running due to engineering works.
The extra travel time may be up to 30 minutes.

Period

In the night from Sunday to Monday, August 22, 2022 between 12:25 AM and 2:00 AM hours.

Advice

Passengers between Amsterdam Centraal and Leiden Centraal travel via Schiphol Airport.

Last update:

Modified timetable

During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:

More about these engineering works

Plan your trip

Plan your trip in advance and use the journey planner.

During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.

Affected lines

The following lines are affected by these engineering works:

Time periods

These engineering works are in effect between Monday, August 22, 2022 12:25 AM and Monday, August 22, 2022 2:00 AM.