Engineering works: Utrecht - Leiden
Situation
Between Utrecht Centraal and Bodegraven the timetable has been changed due to engineering works.
The extra travel time may be up to 30 minutes.
Period
Between Saturday, September 10, 2022 10:00 PM hours and Sunday, September 11, 2022 8:40 AM hours.
Modified timetable
During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:
- Intercity 8800 Leiden C. - Utrecht C. is cancelled between Utrecht Centraal and Bodegraven
More about these engineering works
Plan your trip
Plan your trip in advance and use the journey planner.
During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.
Affected lines
The following lines are affected by these engineering works:
Time periods
These engineering works are in effect between Saturday, September 10, 2022 10:00 PM and Sunday, September 11, 2022 8:40 AM.