engineering works

Engineering works: Schiphol Airport

Situation

From and to Schiphol Airport the timetable has been changed due to engineering works.
Between Amsterdam Centraal and Rotterdam Centraal no trains are running on the high-speed line due to engineering works.
The extra travel time may be up to 30 minutes.

Period

Between Sunday, March 12, 2023 4:00 AM hours and Monday, March 13, 2023 2:00 AM hours.

Advice

Passengers between Schiphol Airport and Rotterdam Centraal travel via Leiden Centraal.

Last update:

Modified timetable

During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:

More about these engineering works

Plan your trip

Plan your trip in advance and use the journey planner.

During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.

Time periods

These engineering works are in effect between Sunday, March 12, 2023 4:00 AM and Monday, March 13, 2023 2:00 AM.