engineering works

Engineering works: Arnhem - Duisburg - Düsseldorf.

Situation

Between Arnhem Centraal and Oberhausen Hbf buses are running due to engineering works.
The extra travel time is more than 30 minutes.

Period

Between Sunday, May 21, 2023 6:00 AM hours and Friday, May 26, 2023 11:00 PM hours.

Last update:

Modified timetable

During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:

More about these engineering works

Plan your trip

Plan your trip in advance and use the journey planner.

During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.

Affected lines

The following lines are affected by these engineering works:

Time periods

These engineering works are in effect between Sunday, May 21, 2023 6:00 AM and Friday, May 26, 2023 11:00 PM.