Engineering works: Utrecht - Arnhem
Situation
Between Utrecht Centraal and Driebergen-Zeist buses are running due to engineering works.
The extra travel time is about 15 minutes.
Period
On Sunday, March 10, 2024 between 1:00 AM and 5:00 PM hours.
Advice
Passengers between Utrecht Centraal and Nijmegen travel via 's-Hertogenbosch.
Modified timetable
During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:
- Buses are running between Utrecht Centraal, Bunnik and Driebergen-Zeist.
- Intercity 3000 Den Helder/Nijmegen - Nijmegen/Den Helder is cancelled between Utrecht Centraal and Driebergen-Zeist
- Intercity 3100 Schiphol Airport/Nijmegen - Nijmegen/Schiphol Airport is cancelled between Utrecht Centraal and Arnhem Centraal
- Sprinter 7300 Breukelen/Rhenen - Rhenen/Breukelen is cancelled between Utrecht Centraal and Driebergen-Zeist
- Intercity 23400 Utrecht C./Nijmegen - Nijmegen/Utrecht C. is cancelled between Utrecht Centraal and Driebergen-Zeist
More about these engineering works
Plan your trip
Plan your trip in advance and use the journey planner.
During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.
Affected lines
The following lines are affected by these engineering works:
Time periods
These engineering works are in effect between Sunday, March 10, 2024 1:00 AM and Sunday, March 10, 2024 5:00 PM.