engineering works

Engineering works: Leiden - Den Haag

Situation

Between Den Haag Laan v NOI and Den Haag Centraal the timetable has been changed due to engineering works.
The extra travel time is about 15 minutes.

Period

Between Monday, March 11, 2024 2:00 AM hours and Thursday, March 14, 2024 5:00 AM hours.

Advice

Passengers between Den Haag Laan v NOI and Den Haag Centraal travel via Den Haag HS.

Last update:

Modified timetable

During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:

More about these engineering works

Plan your trip

Plan your trip in advance and use the journey planner.

During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.

Affected lines

The following lines are affected by these engineering works:

Time periods

These engineering works are in effect between Monday, March 11, 2024 2:00 AM and Thursday, March 14, 2024 5:00 AM.