Engineering works: Amsterdam - Brussel - Paris
Situation
Between Amsterdam Centraal and Antwerpen-Centraal the international timetable has been changed due to engineering works.
Period
Between Saturday, April 20, 2024 6:00 AM hours and Sunday, April 21, 2024 11:59 PM hours.
Advice
Eurostar to Paris Nord will depart earlier from Amsterdam Centraal.
Modified timetable
During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:
- Eurostar 9300 Amsterdam C./Paris-Nord - Paris-Nord/Amsterdam C. departs earlier from between Amsterdam Centraal and Paris-Nord
More about these engineering works
Plan your trip
Plan your trip in advance and use the journey planner.
During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.
Affected lines
The following lines are affected by these engineering works:
Time periods
These engineering works are in effect between Saturday, April 20, 2024 6:00 AM and Sunday, April 21, 2024 11:59 PM.