engineering works

Engineering works: Meppel - Leeuwarden

Situation

Between Leeuwarden and Zwolle no intercities are running due to engineering works.
There is no additional travel time..

Period

On Sunday, April 7, 2024 between 1:30 AM and 7:30 AM hours.

Advice

First Intercity from Leeuwarden to Zwolle is not running. Please use the next available train.

Last update:

Modified timetable

During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:

More about these engineering works

Plan your trip

Plan your trip in advance and use the journey planner.

During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.

Affected lines

The following lines are affected by these engineering works:

Time periods

These engineering works are in effect between:

  • Sunday, April 7, 2024 1:30 AM to Sunday, April 7, 2024 2:00 AM
  • Sunday, April 7, 2024 6:15 AM to Sunday, April 7, 2024 7:30 AM