engineering works

Engineering works: Amsterdam - Utrecht

Situation

Between Amsterdam Bijlmer ArenA and Utrecht Centraal no Sprinters are running due to engineering works.
Between Amsterdam Centraal and Amsterdam Bijlmer ArenA the timetable has been changed due to engineering works.
The extra travel time is between 15 and 30 minutes.

Period

Between Saturday, April 13, 2024 1:00 AM hours and Sunday, April 14, 2024 9:35 PM hours.

Advice

Your NS ticket is valid on metro line 51 and 53 between Amsterdam Centraal and Amstel, and metro line 54 between Amsterdam Centraal and Bijlmer Arena.

Last update:

Modified timetable

During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:

More about these engineering works

Plan your trip

Plan your trip in advance and use the journey planner.

During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.

Affected lines

The following lines are affected by these engineering works:

Time periods

These engineering works are in effect between:

  • Saturday, April 13, 2024 1:00 AM to Saturday, April 13, 2024 9:35 PM
  • Sunday, April 14, 2024 6:15 AM to Sunday, April 14, 2024 9:35 PM