Engineering works: Breukelen - Rotterdam
Situation
Between Breukelen and Woerden buses are running due to engineering works.
The extra travel time is about 15 minutes.
Period
Between Saturday, April 13, 2024 5:45 AM hours and Monday, April 15, 2024 12:45 AM hours.
Modified timetable
During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:
- Local buses are running between Breukelen and Woerden.
- Sprinter 4000 Uitgeest/Rotterdam C. - Rotterdam C./Uitgeest is cancelled between Uitgeest and Rotterdam Centraal
More about these engineering works
Plan your trip
Plan your trip in advance and use the journey planner.
During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.
Affected lines
The following lines are affected by these engineering works:
Time periods
These engineering works are in effect between Saturday, April 13, 2024 5:45 AM and Monday, April 15, 2024 12:45 AM.