Engineering works: Amsterdam - Schiphol
Situation
Between Amsterdam Centraal and Schiphol Airport there are fewer trains running due to engineering works.
The extra travel time is about 15 minutes.
Period
Between Monday, April 29, 2024 4:00 AM hours and Sunday, May 5, 2024 2:00 AM hours.
Modified timetable
During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:
- Sprinter 4600 Den Haag C./Oostvaarders - Oostvaarders/Den Haag C. is cancelled between Amsterdam Muiderpoort and Den Haag Centraal
- Sprinter 5800 Hoofddorp/Vathorst - Vathorst/Hoofddorp does not call at Amsterdam Lelylaan
- Intercity direct 1000 Rotterdam C./Amsterdam C. - Amsterdam C./Rotterdam C. is cancelled between Amsterdam Centraal and Schiphol Airport
- Sprinter 4600 Den Haag C./Oostvaarders - Oostvaarders/Den Haag C. is cancelled between Amsterdam Muiderpoort and Den Haag Centraal
- Sprinter 5800 Hoofddorp/Vathorst - Vathorst/Hoofddorp does not call at Amsterdam Lelylaan
More about these engineering works
Plan your trip
Plan your trip in advance and use the journey planner.
During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.
Affected lines
The following lines are affected by these engineering works:
Time periods
These engineering works are in effect between:
- Monday, April 29, 2024 4:00 AM to Tuesday, April 30, 2024 2:00 AM
- Tuesday, April 30, 2024 4:00 AM to Sunday, May 5, 2024 2:00 AM