construction viaduct

The construction of a viaduct: Zwolle - Almelo

Situation

Between Zwolle and Raalte buses are running due to the construction of a viaduct.
The extra travel time is about 30 minutes.

Period

Between Monday, April 29, 2024 4:00 AM hours and Thursday, May 2, 2024 2:00 AM hours.

Advice

Blauwnet operates buses between Zwolle, Heino, and Raalte. From Zwolle, there are also buses in other directions. Please allow for extra travel time.

Last update:

Modified timetable

During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:

More about these engineering works

Plan your trip

Plan your trip in advance and use the journey planner.

During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.

Affected lines

The following lines are affected by these engineering works:

Time periods

These engineering works are in effect between Monday, April 29, 2024 4:00 AM and Thursday, May 2, 2024 2:00 AM.