Engineering works: Amsterdam - Utrecht; Utrecht - 's-Hertogenbosch
Situation
Between Amsterdam Centraal and Utrecht Centraal the timetable has been changed due to engineering works.
Between Utrecht Centraal and 's-Hertogenbosch the timetable has been changed due to engineering works.
Period
Between Friday, May 17, 2024 5:25 AM hours and Sunday, May 19, 2024 2:00 AM hours.
Advice
Depending on your journey, you may expect an extra transfer at Amsterdam Centraal, Utrecht Centraal, or Geldermalsen.
Modified timetable
During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:
- Intercity 3700 Venlo/Dordrecht - Dordrecht/Venlo is cancelled between Utrecht Centraal and Venlo
- Intercity 703700 Utrecht C./Venlo - Venlo/Utrecht C. runs as extra service between Utrecht Centraal and Venlo
- Intercity 2900 Maastricht/Enkhuizen - Enkhuizen/Maastricht is cancelled between Amsterdam Centraal and 's-Hertogenbosch
- Sprinter 6000 's-Hertogenbosch/Utrecht C. - Utrecht C./'s-Hertogenbosch is cancelled between Utrecht Centraal and 's-Hertogenbosch
- Intercity 703700 Utrecht C./Venlo - Venlo/Utrecht C. will make an extra stop at Geldermalsen and Zaltbommel
More about these engineering works
Plan your trip
Plan your trip in advance and use the journey planner.
During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.
Affected lines
The following lines are affected by these engineering works:
Time periods
These engineering works are in effect between Friday, May 17, 2024 5:25 AM and Sunday, May 19, 2024 2:00 AM.