engineering works

Engineering works: Lelystad - Zwolle

Situation

Between Kampen Zuid and Zwolle a bus service is available due to engineering works.
The extra travel time is about 15 minutes.

Period

Between Thursday, May 30, 2024 11:30 PM hours and Friday, May 31, 2024 2:00 AM hours.

Last update:

Modified timetable

During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:

More about these engineering works

Plan your trip

Plan your trip in advance and use the journey planner.

During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.

Affected lines

The following lines are affected by these engineering works:

Time periods

These engineering works are in effect between Thursday, May 30, 2024 11:30 PM and Friday, May 31, 2024 2:00 AM.