Engineering works: Venlo - Mönchengladbach - Düsseldorf
Situation
Between Mönchengladbach Hbf and Düsseldorf Hbf buses are running due to engineering works.
The extra travel time may be up to 30 minutes.
Period
On Thursday, May 30, 2024 between 9:00 PM and 11:00 PM hours.
Advice
This may affect your journey. Plan your journey in the (International) app.
Modified timetable
During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:
- Local buses are running between Mönchengladbach Hbf, Neuss Hbf and Düsseldorf Hbf.
- Stoptrein 20000 to 20049 Arnhem C./Düsseldorf Hbf - Düsseldorf Hbf/Arnhem C. is cancelled between Mönchengladbach Hbf and Düsseldorf Hbf
More about these engineering works
Plan your trip
Plan your trip in advance and use the journey planner.
During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.
Time periods
These engineering works are in effect between Thursday, May 30, 2024 9:00 PM and Thursday, May 30, 2024 11:00 PM.