Engineering works: Amsterdam - Hilversum; Utrecht - Hilversum
Situation
Between Amsterdam Centraal and Hilversum buses are running due to engineering works.
Between Utrecht Centraal and Hilversum buses are running due to engineering works.
The extra travel time may be up to 45 minutes.
Period
Between Saturday, December 14, 2024 1:45 AM hours and Sunday, December 15, 2024 3:50 AM hours.
The timetable has been modified. You can see the modified timetable on this page.
Use the journey planner to plan your journey. It is usually up-to-date approximately 10 days prior to your travel date.
Modified timetable
During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:
- Buses are running between Amsterdam Centraal, Hilversum Media Park, Hilversum, Hilversum Sportpark and Utrecht Centraal.
- Intercity 21500 to 21506 Amsterdam C. - Utrecht C. is cancelled between Amsterdam Centraal and Utrecht Centraal
- Buses are running between Amsterdam Centraal, Hilversum Media Park, Hilversum, Hilversum Sportpark and Utrecht Centraal.
- Intercity 21500 to 21506 Amsterdam C. - Utrecht C. is cancelled between Amsterdam Centraal and Utrecht Centraal
More about these engineering works
Plan your trip
Plan your trip in advance and use the journey planner.
During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.
Affected lines
The following lines are affected by these engineering works:
Time periods
These engineering works are in effect between Saturday, December 14, 2024 1:45 AM and Sunday, December 15, 2024 3:50 AM.