engineering works

Engineering works: Utrecht - Breukelen; Utrecht - Rhenen

Situation

Between Breukelen and Utrecht Centraal trains do not stop due to engineering works.
Between Utrecht Centraal and Rhenen trains do not stop due to engineering works.
The extra travel time is about 15 minutes.

Period

Between Saturday, January 11, 2025 7:15 PM hours and Sunday, January 12, 2025 2:00 AM hours.

Advice

Passengers from Utrecht Zuilen towards Utrecht Centraal travel via Maarssen.
Passengers from Utrecht Vaartsche Rijn towards Rhenen travel via Utrecht Centraal.
Sprinters from Breukelen to Rhenen do not stop at Utrecht Zuilen and Utrecht Vaartsche Rijn. Use the detour route only in the direction of Rhenen.

The timetable has been modified. You can see the modified timetable on this page.

Use the journey planner to plan your journey. It is usually up-to-date approximately 10 days prior to your travel date.

Last update:

Modified timetable

During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:

More about these engineering works

Plan your trip

Plan your trip in advance and use the journey planner.

During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.

Affected lines

The following lines are affected by these engineering works:

Time periods

These engineering works are in effect between Saturday, January 11, 2025 7:15 PM and Sunday, January 12, 2025 2:00 AM.