signal failure

Signal failure: Hilversum-Lelystad C (21 January 2011)

  1. Update Last update

    De beperkingen tussen Muziekwijk en Naarden-Bussum als gevolg van een seinstoring zijn voorbij. Het treinverkeer is volledig hervat.

More about this disruption

Statistics

This disruption started at 4:50 PM on January 21, 2011 and took 55 minutes in total.

For statistics, this disruption is caused due to a signal failure.

Affected lines

The following lines are affected by this disruption:

Refunds and passenger rights

Got delayed due to this disruption? You may be reimbursed.

Refunds and passenger rights