signal and level crossing failure

Signal and level crossing failure: Utrecht Centraal-Ede-Wageningen/Rhenen (23 January 2011)

  1. Update Last update

    De beperkingen tussen Utrecht Centraal en Driebergen-Zeist als gevolg van een sein- en overwegstoring zijn voorbij. Houdt u nog rekening met een langere reistijd.

More about this disruption

Statistics

This disruption started at 10:55 AM on January 23, 2011 and took 1 hour, 30 minutes in total.

For statistics, this disruption is caused due to a signal and level crossing failure.

Affected lines

The following lines are affected by this disruption:

Refunds and passenger rights

Got delayed due to this disruption? You may be reimbursed.

Refunds and passenger rights