signal and level crossing failure

Signal and level crossing failure: Stavoren-Leeuwarden (28 January 2011)

  1. Update Last update

    De beperkingen tussen Leeuwarden en Stavoren als gevolg van een sein- en overwegstoring zijn voorbij.
    Het treinverkeer is volledig hervat.

More about this disruption

Statistics

This disruption started at 8:20 AM on January 28, 2011 and took 2 hours, 45 minutes in total.

For statistics, this disruption is caused due to a signal and level crossing failure.

Affected lines

The following lines are affected by this disruption:

Refunds and passenger rights

Got delayed due to this disruption? You may be reimbursed.

Refunds and passenger rights