level crossing failure

Level crossing failure: Maastricht-Liège-Guillemins/Maastricht Randw (3 November 2015)

  1. Update Last update

    Tussen Maastricht en Maastricht Randw langere reistijd door een overwegstoring.
    Houdt u rekening met een extra reistijd van 5 - 10 min.
    De verstoring is naar verwachting rond 20:30 uur verholpen.

More about this disruption

Statistics

This disruption started at 6:34 PM on November 3, 2015 and took 23 minutes in total.

For statistics, this disruption is caused due to a level crossing failure.

Affected lines

The following lines are affected by this disruption:

Refunds and passenger rights

Got delayed due to this disruption? You may be reimbursed.

Refunds and passenger rights