signal and level crossing failure

Signal and level crossing failure: Zaandam-Hoorn (26 April 2016)

  1. Update Last update

    Tussen Zaandam en Hoorn rijden minder treinen door een sein- en overwegstoring.
    Houdt u rekening met een extra reistijd van 15 - 30 min.
    De verstoring is naar verwachting rond 12:30 uur verholpen.

More about this disruption

Statistics

This disruption started at 10:01 AM on April 26, 2016 and took 31 minutes in total.

For statistics, this disruption is caused due to a signal and level crossing failure.

Affected lines

The following lines are affected by this disruption:

Refunds and passenger rights

Got delayed due to this disruption? You may be reimbursed.

Refunds and passenger rights