signalling and points failure

Signalling and points failure: Arnhem C.-Winterswijk (10 July 2016)

  1. Update Last update

    Tussen Zevenaar en Wehl rijden geen treinen door een sein- en wisselstoring.
    De extra reistijd is meer dan 60 min.
    De verstoring is naar verwachting rond 17:30 uur verholpen.

More about this disruption

Statistics

This disruption started at 2:41 PM on July 10, 2016 and took 2 hours, 22 minutes in total.

For statistics, this disruption is caused due to a signalling and points failure.

Affected lines

The following lines are affected by this disruption:

Refunds and passenger rights

Got delayed due to this disruption? You may be reimbursed.

Refunds and passenger rights