seinstoring

Signal failure: Maastricht-Randwijck (28 May 2017)

  1. Disruption resolved Last update

    Between Maastricht and Maastricht Randwyck the train traffic is fully resumed.

  2. Delays decreasing

    Between Maastricht and Maastricht Randwyck the restrictions are resolved.
    Delays are decreasing.
    Service is normal around 6:30 PM hours.

    Train measures

    • Sneltrein 32100 Maastricht - Heerlen is cancelled between Maastricht and Maastricht Randwyck
  3. Update

    Between Maastricht and Maastricht Randwyck there are fewer trains running due to a signal failure.
    The extra travel time may be up to 15 minutes.
    It is not known yet how long this will take.

    Train measures

    • Sneltrein 32100 Maastricht - Heerlen is cancelled between Maastricht and Maastricht Randwyck
  4. Update

    Between Maastricht and Maastricht Randwyck there are fewer trains running due to a signal failure.
    The extra travel time may be up to 30 minutes.
    It is not known yet how long this will take.

    Train measures

    • Sneltrein 32100 Maastricht - Heerlen is cancelled between Maastricht and Maastricht Randwyck
  5. Disruption

    Between Maastricht and Maastricht Randwyck there are fewer trains running due to a signal failure.
    The extra travel time may be up to 30 minutes.
    It is not known yet how long this will take.

  6. Update

    Between Maastricht and Maastricht Randwyck there is a service disruption due to a signal failure.
    Updates will follow as more information becomes available.

More about this disruption

Statistics

This disruption started at 1:52 PM on May 28, 2017 and took 5 hours, 18 minutes in total.

For statistics, this disruption is caused due to a signal failure.

Affected lines

The following lines are affected by this disruption:

Operators

This disruption affects trains operated by Arriva and NMBS.

Got delayed due to this disruption? You may be reimbursed.

Refunds and passenger rights