sein- en overwegstoring

Signal and level crossing failure: Heerlen-Kerkrade; Heerlen-Herzogenrath (22 June 2017)

  1. Disruption resolved Last update

    Between Heerlen and Landgraaf the train traffic is fully resumed.

  2. Delays decreasing

    Between Heerlen and Landgraaf the restrictions are resolved.
    Delays are decreasing.
    Service is normal around 2:45 PM hours.

  3. Update

    Between Heerlen and Landgraaf no trains are running due to a signal and level crossing failure.
    The extra travel time is more than 60 minutes.
    It is not known yet how long this will take.

  4. Disruption

    Between Landgraaf and Kerkrade Centrum no trains are running due to a signal and level crossing failure.
    The extra travel time is more than 60 minutes.
    It is not known yet how long this will take.

More about this disruption

Statistics

This disruption started at 2:05 PM on June 22, 2017 and took 38 minutes in total.

For statistics, this disruption is caused due to a signal and level crossing failure.

Affected lines

The following lines are affected by this disruption:

Operators

This disruption affects trains operated by NS, Arriva and Deutsche Bahn.

Got delayed due to this disruption? You may be reimbursed.

Refunds and passenger rights