beperkingen materieel

Problems with the rolling stock: Amersfoort-Barneveld (1 December 2017)

  1. Disruption resolved Last update

    Between Amersfoort and Barneveld Zuid the train traffic is fully resumed.

  2. Update

    Between Amersfoort and Barneveld Zuid there are fewer local trains running due to problems with the rolling stock.
    The extra travel time may be up to 15 minutes.
    It is not known yet how long this will take.

  3. Update

    Between Amersfoort and Barneveld Zuid there are delays and fewer trains are running due to problems with the rolling stock.
    It is not known yet how long this will take.

  4. Disruption

    Between Amersfoort and Barneveld Zuid there are fewer trains running due to problems with the rolling stock.
    The extra travel time may be up to 15 minutes.
    It is not known yet how long this will take.

More about this disruption

Statistics

This disruption started at 9:54 AM on December 1, 2017 and took 3 hours, 41 minutes in total.

For statistics, this disruption is caused due to problems with the rolling stock.

Affected lines

The following lines are affected by this disruption:

Operators

This disruption affects trains operated by Connexxion.

Got delayed due to this disruption? You may be reimbursed.

Refunds and passenger rights