overwegstoring

Level crossing failure: Zwolle-Groningen (11 December 2017)

  1. Disruption resolved Last update

    Between Assen and Groningen the train traffic is fully resumed.

More about this disruption

Statistics

This disruption started at 10:06 PM on December 11, 2017 and took 0 seconds in total.

For statistics, this disruption is caused due to a level crossing failure.

Affected lines

The following lines are affected by this disruption:

Operators

This disruption affects trains operated by NS.

Got delayed due to this disruption? You may be reimbursed.

Refunds and passenger rights