uitloop werkzaamheden

Over-running engineering works: Amersfoort-Ede-Wageningen (19 January 2018)

  1. Disruption resolved Last update

    Between Barneveld Zuid and Ede-Wageningen the train traffic is fully resumed.

    Train measures

    • Stoptrein 31300 Amersfoort - Ede-Wageningen is cancelled between Barneveld Centrum and Ede-Wageningen
  2. Disruption

    Between Barneveld Zuid and Ede-Wageningen no trains are running due to over-running engineering works.
    It is not known yet how long this will take.

    Train measures

    • Stoptrein 31300 Amersfoort - Ede-Wageningen is cancelled between Barneveld Centrum and Ede-Wageningen

More about this disruption

Statistics

This disruption started at 5:30 AM on January 19, 2018 and took 1 hour, 23 minutes in total.

For statistics, this disruption is caused due to over-running engineering works.

Affected lines

The following lines are affected by this disruption:

Operators

This disruption affects trains operated by Connexxion.

Got delayed due to this disruption? You may be reimbursed.

Refunds and passenger rights