Over-running engineering works: Amersfoort-Ede-Wageningen (19 January 2018)
Current status:
This disruption is resolved.
-
Disruption resolved Last update
Between Barneveld Zuid and Ede-Wageningen the train traffic is fully resumed.
Train measures
- Stoptrein 31300 Amersfoort - Ede-Wageningen is cancelled between Barneveld Centrum and Ede-Wageningen
-
Disruption
Between Barneveld Zuid and Ede-Wageningen no trains are running due to over-running engineering works.
It is not known yet how long this will take.Train measures
- Stoptrein 31300 Amersfoort - Ede-Wageningen is cancelled between Barneveld Centrum and Ede-Wageningen
More about this disruption
Statistics
This disruption started at 5:30 AM on January 19, 2018 and took 1 hour, 23 minutes in total.
For statistics, this disruption is caused due to over-running engineering works.
Operators
This disruption affects trains operated by Connexxion.
Got delayed due to this disruption? You may be reimbursed.