signal and level crossing failure

Signal and level crossing failure: Winterswijk-Zutphen (15 February 2011)

  1. Update Last update

    De beperkingen tussen Zutphen en Winterswijk als gevolg van een sein- en overwegstoring zijn voorbij. Het treinverkeer is volledig hervat.

More about this disruption

Statistics

This disruption started at 1:40 PM on February 15, 2011 and took 2 hours, 5 minutes in total.

For statistics, this disruption is caused due to a signal and level crossing failure.

Affected lines

The following lines are affected by this disruption:

Refunds and passenger rights

Got delayed due to this disruption? You may be reimbursed.

Refunds and passenger rights