overwegstoring

Level crossing failure: Dordrecht-Breda (16 April 2018)

  1. Disruption resolved Last update

    Between Dordrecht and Breda the train traffic is fully resumed.

  2. Update

    Between Dordrecht and Breda no intercities are running due to a level crossing failure.
    The extra travel time may be up to 30 minutes.
    It is not known yet how long this will take.

More about this disruption

Statistics

This disruption started at 1:10 PM on April 16, 2018 and took 43 minutes in total.

For statistics, this disruption is caused due to a level crossing failure.

Affected lines

The following lines are affected by this disruption:

Operators

This disruption affects trains operated by NS.

Got delayed due to this disruption? You may be reimbursed.

Refunds and passenger rights