signal and level crossing failure

Signal and level crossing failure: Rotterdam C-Den Haag C (18 February 2011)

  1. Update Last update

    De beperkingen tussen Rotterdam C en Den Haag C als gevolg van een sein- en overwegstoring zijn voorbij. Het treinverkeer is volledig hervat.

More about this disruption

Statistics

This disruption started at 7:00 AM on February 18, 2011 and took 1 hour, 20 minutes in total.

For statistics, this disruption is caused due to a signal and level crossing failure.

Affected lines

The following lines are affected by this disruption:

Refunds and passenger rights

Got delayed due to this disruption? You may be reimbursed.

Refunds and passenger rights