Signal failure: Deventer-Enschede (3 September 2018)
Current status:
This disruption is resolved.
-
Disruption resolved Last update
Between Deventer and Enschede the train traffic is fully resumed.
More about this disruption
Statistics
This disruption started at 1:14 PM on September 3, 2018 and took 0 seconds in total.
For statistics, this disruption is caused due to a signal failure.
Affected lines
The following lines are affected by this disruption:
Operators
This disruption affects trains operated by NS, NS International, Keolis and Blauwnet.
Got delayed due to this disruption? You may be reimbursed.