uitloop werkzaamheden

Over-running engineering works: Tilburg-Eindhoven (6 September 2018)

  1. Disruption resolved Last update

    Between Eindhoven and Tilburg the train traffic is fully resumed.

  2. Update

    Between Eindhoven and Tilburg there is a service disruption due to over-running engineering works.
    Updates will follow as more information becomes available.

  3. Disruption resolved

    Between Eindhoven and Tilburg the train traffic is fully resumed.

  4. Disruption resolved

    Between Boxtel and Tilburg the train traffic is fully resumed.

  5. Disruption

    Between Boxtel and Tilburg there is a service disruption due to over-running engineering works.
    Updates will follow as more information becomes available.

More about this disruption

Statistics

This disruption started at 4:22 AM on September 6, 2018 and took 57 minutes in total.

For statistics, this disruption is caused due to over-running engineering works.

Affected lines

The following lines are affected by this disruption:

Operators

This disruption affects trains operated by NS.

Got delayed due to this disruption? You may be reimbursed.

Refunds and passenger rights