sein- en overwegstoring

Signal and level crossing failure: Eindhoven-Venlo; Amsterdam-Venlo-Mönchengladbach-Köln (8 October 2018)

  1. Disruption resolved Last update

    Between Eindhoven and Blerick there is a service disruption due to a signal and level crossing failure.

More about this disruption

Statistics

This disruption started at 8:28 AM on October 8, 2018 and took 0 seconds in total.

For statistics, this disruption is caused due to a signal and level crossing failure.

Affected lines

The following lines are affected by this disruption:

Operators

This disruption affects trains operated by NS.

Got delayed due to this disruption? You may be reimbursed.

Refunds and passenger rights